ZDS, in conjunction with a Tier 1 Quantity Surveying Consultancy, took part in a project involving the construction of a 280-km electrical system for the UK’s new high-speed rail link. This link connects London, Birmingham, and Crewe, enabling HS2 trains to integrate with the existing West Coast Mainline. ZDS’s focus was on Quantity Surveying during the post-contract period.